Aran Skirt update #2
This skirt is taking a long time, but I’m really getting into it. This is a shot at row 135. One side is about 244 rows….so I have another side to do after this.
Cutting down all of the trees hanging over the dome this weekend. Getting ready to re-foam some of the seams on the dome, and to get foam “eyebrows” put over the doors. Hopefully, it will make the dome look more hobbit-hole-like. Possibly starting the power-washing too.

